Product Details:
Payment & Shipping Terms:
|
Name: | Vacuum Frying Food Machine | Frying Temperature: | 75-110℃ |
---|---|---|---|
Filter Type: | Vacuum Filter | Control System: | Full Microcomputer Automatic Control |
De-oil Speed & Form: | 300 R/min Inside-collocate De-oil | Electric System: | 3N-380V/220V |
Heating Method: | Steam Or Thermal Oil | Quality: | High Performance |
High Light: | vacuum frying machine,vacuum fried chips machine |
Multi Function Vacuum Fryer Equipment Full Microcomputer Control
1.vacuum fryer chips machineis widely used in production of fruits and vegetables chips, and is the vital equipment of the whole production.
2.The vacuum degree can reach -0.098Mpa, which lower the frying temperature and enhances the conductibility of heat and water in the materials. This helps bettering the products’ quality and saving energy consumption. A high vacuum degree avoids the infiltration of oil into chips, so it produces high-quality, well tasted, and crispy chips. 3.Low temperature frying also make the healthy fruits and vegetable chips.
4.Low temperatur vacuum frying machine will use the heat conducting medium,under negative pressure condition of low temperature
dehydration processing for food raw material,make maximum retention products processed primary color,flavor,the original nutrition.
1. Boiler: 300kg boiler for one set 200kg input ( if 3 sets machines, need 1ton boiler), steam pressure: 4kg-8kg
2. Cooling tower: 30tons-50tons, it depends on different environment
3. Water pump: 4kw
4. Cooling water tank: 2.5*2.5*1cm
5. Wire to our distribution box
Model | Basket size (mm) | Capacity (kg/batch) | Power (kw) | Overall size (mm) |
VF-LY50 | dia600*500 | 30~50 | 15 | 1400*3500*2500 |
VF-LY100 | dia750*530 | 80~100 | 22 | 1800*4000*2900 |
VF-LY200 | dia1200*600 | 150~200 | 30 | 2500*4500*3100 |
1. Oil storage tank
It is for oil storage before frying. The oil will be heated in it firstly. During frying, the oil will be cycled between oil storage tank and frying pot.
2. PLC control system
Brand: Mitsubishi
It is control the whole machine.
This make the machine operate fully automatically. No need to manual during processing.
3. Touch screen
Brand: Mitsubishi
The new type is connect directly with the machine body, not separate part.
It is easy to understand and operate.
4. Electrical Components
Brand: Schneider
It mainly includes dis-connector, frequency converter and thermal overload relay.
Catalog for Automatic Vacuum Frying Machine.pdf
In recent years, our company's technological innovation has continued to develop. The number of invention patents has continuously increased. Companies in good faith, quality, innovation, professionalism, unity, and enterprising, to achieve manufacturing, installation, one-stop after-sales service. We can better serve our customers. Excellent professional technical and sales talents, as well as advanced technology and engineering level, will solve the challenges you face in the production.
Our company will sincerely cooperate with friends from all walks of life to develop together.
1. Fumigation wooden case with water-proof embrace
2. Nude pack after plastic film wrapping
3. Upon your requirements
We provide high quality service:
1) Consultation before, during, and after sales;
2) Project planning and design;
3) Debugging until everything is functional;
4) Shipping management from factory to the destination;
5) Installing, maintenance and operation training;
6) New production techniques and formulas;
7) 1 year complete warranty and life-time maintenance service.
FAQ
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacturer. You will get competitive price and high quality.
3) Can you guarantee your quality?
Of course. We are the factory. More important, we put a high value on our reputation. High quality is our principle all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place an order, for small quantity 15-20 days is enough. For big quantity, we can talk further.
5) What about the transportation and delivery date?
Normally we use sea for shipment to save customer's money. It is about 25-40 days. It also depends on which country and port you are.
Contact Person: Grace Li